360's Latest Posts

Auckland Tramway

|
Auckland Tramway

After an absence of more than 50 years electric trams have returned to Auckland offering a classic travel experience around the Wynyard Quarter. It’s a journey of vibrant experiences featuring parks, plazas, restaurants, cafes, events, markets, shops and super yachts. There are two Trams which make four stops and take 15 minutes for a full circuit, […]

Continue Reading

Australian Sales Partner Registration of Interest

|
Australian Sales Partner Registration of Interest

To strengthen our international presence we are looking for competent sales partners to represent the Steintec brands throughout all states of Australia. In the field of Specialist Paving Mortar and Grouts we are looking for partners in: South Australia – Tasmania – New South Wales – Victoria – Western Australia – Queensland – Australian Capital […]

Continue Reading

Steintec introduction for the application of Tuffest G

|
Steintec introduction for the application of Tuffest G

Steintec introduction video shows the construction of a panel of paving using the revolutionary tuffset G single-solution, rapid strength gain paving mortar. After only 3 hours the pavement can be opened to heavy goods vehicles including bus traffic. tuffset G is ideal for repairs where long term closure is not an option. tuffset G is […]

Continue Reading

Steintec introduction for the application of Tuffgrout.

|
Steintec introduction for the application of Tuffgrout.

Steintec introduction video shows slurry grouting with Steintec tuffgrout jointing mortar. The grout is mixed as a free-flowing slurry and poured onto a clean wet pavement. It is worked into the joints with a squeegee at about 45 degrees to the joint. The pavement is kept misted with water to prevent the grout from drying […]

Continue Reading

Jellicoe Street

|
Jellicoe Street

Jellicoe Street is a paved and tree-lined 500m boulevard linked with rain gardens including a 1.5km tramline. On Saturday August 6 Waterfront Auckland is holding a public open day to celebrate the opening of the first stage of the Wynyard Quarter redevelopment. The past 18 months have seen several areas along Jellicoe Street and Wynyard Quarter […]

Continue Reading