Priming Mortar Consumption Calculation

 

 

This information is to assist with calculating the amount of mortar required.

 

 

 

Kerry Evans
technical director

If you have a project that you'd like to discuss, please feel free to email or call me.

0800 360 urban

 
Useful links

 

 

 
The consumption of priming or bonding mortar is about 1.5 kg/m² per layer applied.

If priming mortar is to be applied both to the surface of the roadbase and to the underside of paving elements, consumption is approximately 3 kg/m²

 